Tld 26.1 Flowline Se Helmet - Mips Hydro Sage / Charcoal
Tld 26.1 Flowline Se Helmet - Mips Hydro Sage / Charcoal - M/L is backordered and will ship as soon as it is back in stock.
Pickup currently unavailable at 24 Main St
Local Delivery Available
Local Delivery Available
Yarra Valley Cycles offer Local delivery within 20km. Some Fees apply.
Postage & Shipping - Free on "most" small parcel orders over $200
Postage & Shipping - Free on "most" small parcel orders over $200
YVC offers Free Shipping on most small items online when your spend over $200. Large & Bulky items may attract shipping fee. Calculated at Checkout.
Tld 26.1 Flowline Se Helmet - Mips Hydro Sage / Charcoal - M/L is backordered and will ship as soon as it is back in stock.
Description
Description
Flowline SE MIPS Open Face Helmet
The Trail Rider’s Workhorse
DISCIPLINE: Trail
Mips® equipped and eMTB-rated, Flowline SE sets the standard for safety within a modern, minimalist design, achieving a five-star safety rating from Virginia Tech. With 14 vents, an anti-microbial liner, and a Fidlock® magnetic buckle system, Flowline SE is the workhorse of trail helmets.
FEATURES
• 3-Way adjustable screwless visor
• Mips® B-Series Rotational Impact Brain Protection System
• Full 360-degree fit retention system with 3-way rear height adjustment
• 14 vents for maximum airflow
• Full wrap in-mold construction
• Extended Coverage MTB Trail Helmet
• Fidlock® Magnetic Buckle System
• Dual Density EPS for low and high-speed impacts
• Anti-microbial Quick Dry Premium Liner
• Side strap adjusters
Payment & Security
Payment methods
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.
![Tld 26.1 Flowline Se Helmet - Mips Hydro Sage / Charcoal [sz:m/l]](http://www.yarravalleycycles.com.au/cdn/shop/files/887202536076_1.jpg?v=1778219160&width=1214)
![Tld 26.1 Flowline Se Helmet - Mips Hydro Sage / Charcoal [sz:m/l]](http://www.yarravalleycycles.com.au/cdn/shop/files/887202536076_2.jpg?v=1778219162&width=1214)
![Tld 26.1 Flowline Se Helmet - Mips Hydro Sage / Charcoal [sz:m/l]](http://www.yarravalleycycles.com.au/cdn/shop/files/887202536076_3.jpg?v=1778219164&width=1214)
![Tld 26.1 Flowline Se Helmet - Mips Hydro Sage / Charcoal [sz:m/l]](http://www.yarravalleycycles.com.au/cdn/shop/files/887202536076_4.jpg?v=1778219166&width=1214)
![Tld 26.1 Flowline Se Helmet - Mips Hydro Sage / Charcoal [sz:m/l]](http://www.yarravalleycycles.com.au/cdn/shop/files/887202536076_5.jpg?v=1778219167&width=1214)